Rockfall mesh installation across the steep volcanic face at Stonefields

Rockfall Protection / Slope Stabilisation

Stonefields Rockfall Mesh Installation

Steep volcanic slopes above a major Auckland residential development needed securing against rockfall onto homes and roads below. Geo Mana installed 19,000m² of high-strength rockfall mesh, anchored with rock bolts and cable systems, delivered entirely by rope access and Elevated Work Platforms where machines couldn't reach. Working around occupied homes and an active construction programme, the team kept safe zones in place throughout and finished on programme — eliminating the rockfall risk and supporting Stonefields' continued growth.

Stonefields, AucklandField record 01

The challenge

What made this difficult

A large-scale residential development at Stonefields needed steep volcanic slopes stabilised to stop rockfall reaching the properties and roads below. Over 19,000m² of slope face required protection. The work had to be delivered around an active construction programme and occupied homes, with tight constraints on access and disruption.

Specific issues

  • Steep volcanic terrain with loose, unstable rock across a large area

  • Limited machinery access, requiring specialist rope access techniques

  • Active residential development demanding safe, low-disruption delivery

  • Scale of works: 19,000m² of slope face

The response

  1. 01

    Installed high-strength rockfall mesh across the full slope face, secured with rock bolts, anchoring, and cable systems

  2. 02

    Delivered all works through specialist rope access and Elevated Work Platforms to manage the steep terrain safely

  3. 03

    Coordinated with larger construction partners to integrate the slope stabilisation into the wider development programme

  4. 04

    Maintained safe working zones around occupied properties throughout the job

Spec snapshot

The numbers on record

  • 01Rockfall mesh installed: 19,000m² of slope face
  • 02Mesh secured with rock bolts, anchoring, and cable systems
  • 03All works delivered via rope access and Elevated Work Platforms

The outcome

Work that holds up.

The team installed 19,000m² of high-strength rockfall mesh safely and on programme. Every section of the slope face was secured with rock bolts, anchoring, and cable systems, delivered by rope access and Elevated Work Platforms where machinery could not reach. Work was sequenced alongside the wider construction programme, with safe working zones maintained around occupied homes from start to finish. The completed stabilisation eliminated the rockfall risk to the properties and roads below and supported the continued growth of the Stonefields development. It stands as proof of what Geo Mana delivers at scale on steep, difficult terrain.

  • Rockfall mesh installation
  • Rock bolts and anchoring
  • Cable systems
  • Rope access
  • Elevated Work Platforms
  • Crane operations

Your ground

Facing something similar?

Send the location, a few photos and any engineering information you have. We will tell you the practical next step.

Discuss a project